Abstract : Submerged dam is a commonly used structure to control the reaches of a braided river, and it is generally located at the entrance of the inlet. The flows in these areas are often complex. It may cause downstream scouring after the completion of the submerged dam and the consequent uneven subsidence. Riprap reinforcement is an important measure of maintaining the function of the submerged dam. The conventional riprap reinforcement project is used in the bank protection. The traditional stone-thro
Keywords : Field Test, Positioning Analysis, Deep Water Submerged Dam, field, test