Abstract : With the increasing depth of underground engineering, the accurate evaluation of the depth and the degree of excavation damage zone (EDZ) in deep rock engineering is gradually influenced by the high geostress field and it is important to assess the impact reasonably. Relying on the excavation of a deep diversion tunnel, the drilling plan of distressing the in-situ stress step by step was adopted. At the outer zone of sampling area, conventional sampling holes were drilled in the form of a circul
Keywords : EDZ, High In, Stress Level, Acoustic Detection, effects